Case Study

Electrical Installation for FR11 – 28 MW Facility

Project Overview

The FR11 28 MW project was developed to provide a high-capacity electrical infrastructure capable of supporting heavy industrial operations with long-term reliability and efficiency. Located in a mixed-use industrial zone, the facility required a robust electrical design meeting both IEC 60364 standards and local distribution network operator (DNO) requirements.

The Scope Included:

  • Primary HV supply and substation
  • Transformer installations
  • LV distribution systems
  • Cable management and containment
  • Protection, control, and monitoring systems
  • Integration with building services and automation systems

The Key Goals of the Installation Were:

1.

Deliver a safe, compliant, and efficient electrical system to support a 28 MW load profile.

2.

Ensure redundancy for critical operations.

3.

Allow for future capacity expansion without major infrastructure changes.

4.

Minimise downtime during commissioning by pre-fabrication and staged installation.